[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126504":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1126504,792,1,"单选题","基坑围护桩水平位移一般采用（）监测。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","水准仪",false,{"key":16,"text":17,"correct":14},"B","钢筋计",{"key":19,"text":20,"correct":21},"C","测斜仪",true,{"key":23,"text":24,"correct":14},"D","收敛计","表2K320133-1 基坑围护桩水平位移的监测方法有测斜管、测斜仪等",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]