[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126476":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1126476,792,1,"单选题","当道路工程施工现场日平均气温连续()天稳定低于5℃时，应视为进入冬期施工。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","5",true,{"key":16,"text":17,"correct":18},"B","4",false,{"key":20,"text":21,"correct":18},"C","3",{"key":23,"text":24,"correct":18},"D","2","(一)冬期施工基本要求（1）当施工现场环境日平均气温连续5d稳定低于5℃，或最低环境气温低于一3℃时，应视为进入冬期施工。可见选A",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]