[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126302":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1126302,792,1,"单选题","现浇混凝土盖梁前，搭设施工脚手架时不能实施选项()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","通道必须设置临边防护",false,{"key":16,"text":17,"correct":18},"B","必须与承重支架相连接",true,{"key":20,"text":21,"correct":14},"C","必须可靠接地",{"key":23,"text":24,"correct":14},"D","必须验收合格后方可使用","(4) 安设支架、拱架过程中，应随安装随架设临时支撑。采用多层支架时，支架的横 垫板应水平，立柱应铅直，上下层立柱应在同一中心线上。 (5) 支架或拱架不得与施工脚手架、便桥相连。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]