[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126118":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1126118,792,1,"单选题","（2012年真题）基坑边坡挂网喷射混凝土施工完成后，应喷水养护，一般养护不少于（ ）d。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","3",false,{"key":16,"text":17,"correct":14},"B","5",{"key":19,"text":20,"correct":21},"C","7",true,{"key":23,"text":24,"correct":14},"D","14","本题考查的是明挖基坑施工技术要求。有支护的基坑喷射混凝土施工完成后，混凝土终凝2h后，应喷水养护；一般工程，养护不少于7d，重要工程，养护不少于14d。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]