[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126094":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1126094,792,1,"单选题","关于特殊过程质量控制的说法，正确的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","对工程施工项目质量计划规定的特殊过程，应设置分部质量控制点",false,{"key":16,"text":17,"correct":18},"B","除应执行一般过程控制的规定外，还应由专业技术人员编制专门的作业指导书",true,{"key":20,"text":21,"correct":14},"C","缺少经验的工序应安排试验，编制成作业指导书，按需要进行首件(段)验收",{"key":23,"text":24,"correct":14},"D","编制的作业指导书，应经监理工程师审批后执行","P255-257 特殊过程控制： (1)对工程施工项目质量计划规定的特殊过程,应设置工序质量控制点进行控制。 (2)对特殊过程的控制,除应执行一般过程控制的规定外,还应由专业技术人员编制专门的作业指导书。 (3)不太成熟的工艺或缺少经验的工序应安排试验,编制成作业指导书,并进行首件(段)验收。 (4)编制的作业指导书,应经项目部或企业技术负责人审批后执行。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]