[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126049":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1126049,792,1,"单选题","柔性管道回填时间宜在一昼夜中（）气温时段。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","平均",false,{"key":16,"text":17,"correct":14},"B","最高",{"key":19,"text":20,"correct":21},"C","最低",true,{"key":23,"text":24,"correct":14},"D","管材要求的","P296-298 柔性管道回填时间宜在一昼夜中气温最低时段,从管道两侧同时回填,同时夯实。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]