[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1126045":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1126045,792,1,"单选题","钻孔灌注桩单桩混凝土灌注时间宜控制在（）内。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1．2倍混凝土初凝时间",false,{"key":16,"text":17,"correct":18},"B","1．5倍混凝土初凝时间",true,{"key":20,"text":21,"correct":14},"C","1．2倍混凝土终凝时间",{"key":23,"text":24,"correct":14},"D","1．5倍混凝土终凝时间","P267-270 导管的埋置深度宜控制在2~6m。混凝土灌注过程中拔管应有专人负责指挥，并分别采用理论灌入量计算孔内混凝土面和重锤实测孔内混凝土面，取两者的低值来控制拔管长度，确保导管的埋置深度不小于2m。单桩混凝土灌注时间宜控制在1.5倍混凝土初凝时间内。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]