[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1125994":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1125994,792,1,"单选题","关于分部工程、单位工程验收程序的说法，错误的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","分部工程应由施工单位项目经理组织监理单位和项目技术、质量负责人等进行验收",true,{"key":16,"text":17,"correct":18},"B","单位工程完工后，在施工单位自检合格基础上，由总监理工程师组织专业监理工程师对工程质量进行竣工预验收",false,{"key":20,"text":21,"correct":18},"C","预验收合格后，由施工单位向建设单位提交工程竣工报告，申请工程竣工验收",{"key":23,"text":24,"correct":18},"D","建设单位收到工程竣工报告后，其（项目）负责人组织施工、设计、勘察、监理等单位进行单位工程验收","2020版教材P325 （2）分部工程应由总监理工程师组织施工单位项目负责人和项目技术、质量负责人等进行验收。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]