[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1125980":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1125980,792,1,"单选题","关于应对基坑坍塌、淹埋事故的说法，正确的是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","及早发现坍塌、淹埋事故的征兆，及早组织抢救仪器、设备",false,{"key":16,"text":17,"correct":14},"B","及早发现坍塌、淹埋事故的征兆，及早组织抢险",{"key":19,"text":20,"correct":14},"C","及早发现坍塌、淹埋事故的征兆，及早进行应急演练",{"key":22,"text":23,"correct":24},"D","及早发现坍塌、淹埋事故的征兆，及早组织施工人员撤离现场",true,"2020版教材P312 （3）进行信息化施工，及早发现坍塌、掩埋和管线破坏事故的征兆。如果基坑即将坍塌、掩埋时，应以人身安全为第一要务，及早撤离现场。@##",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]