[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1125857":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1125857,792,1,"单选题","施工阶段，应适时对施工现场( )进行调整。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","管理目标",false,{"key":16,"text":17,"correct":14},"B","用电平面布置",{"key":19,"text":20,"correct":21},"C","总平面布置",true,{"key":23,"text":24,"correct":14},"D","管理体系","2020版教材P237 市政公用工程的施工平面布置图有明显的动态特性。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]