[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1125808":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1125808,792,1,"单选题","《城市桥梁工程施工与质量验收规范》(CJJ2—2008)规定，隐蔽工程在隐蔽前，应由（ ）单位通知监理工程师和相关单位进行隐蔽验收，确认合格后，形成隐蔽验收文件。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工",true,{"key":16,"text":17,"correct":18},"B","设计",false,{"key":20,"text":21,"correct":18},"C","勘察",{"key":23,"text":24,"correct":18},"D","建设","P336 隐蔽工程在隐蔽前，应由施工单位通知监理工程师和相关单位进行隐蔽验收，确认合格后，形成隐蔽验收文件。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]