[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1125782":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1125782,792,1,"单选题","下列关于城镇道路施工分项工程验收的说法中，最规范的是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","前一分项工程未经检验，后一分项工程不可施工",false,{"key":16,"text":17,"correct":14},"B","前一分项工程未经检验，后一分项工程不宜施工",{"key":19,"text":20,"correct":14},"C","前一分项工程未经检验，后一分项工程不应施工",{"key":22,"text":23,"correct":24},"D","前一分项工程未经验收合格严禁进行后一分项工程施工",true,"2020版教材P335 城市道路工程施工过程技术管理的基本规定。城镇道路施工中，前一分项工程未经验收合格严禁进行后一分项工程施工。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]