[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1125763":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1125763,792,1,"单选题","根据《城市轨道交通I程监测技术规范》GB 50911-2013， 支撑轴力为应测项目的基坑工程监测等级为()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","所有等级",true,{"key":16,"text":17,"correct":18},"B","一级",false,{"key":20,"text":21,"correct":18},"C","二级",{"key":23,"text":24,"correct":18},"D","三级","2021\u002F2020版教材P201 明挖法和盖挖法基坑支护结构和周围岩土体监测项目 表2K317022-2",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]