[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1125681":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1125681,792,1,"单选题","下列改性沥青混合料路面横接缝处理做法中，错误的是（）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","用3m直尺检查端部平整度及厚度",false,{"key":16,"text":17,"correct":14},"B","在其冷却之前垂直切割端部不平整及厚度不符合要求的部分",{"key":19,"text":20,"correct":21},"C","在其冷却之后垂直切割端部不平整及厚度不符合要求的部分",true,{"key":23,"text":24,"correct":14},"D","将横接缝冲净、干燥，第二天涂刷粘层油后再铺新料","P22-24 (1)改性沥青混合料路面冷却后很坚硬，冷接缝处理很困难，因此应尽量避免出现冷接缝。 (2)摊铺时应保证充足的运料车次，满足摊铺的需要，使纵向接缝成为热接缝。在摊铺特别宽的路面时，可在边部设置挡板。在处理横接缝时，应在当天改性沥青混合料路面施工完成后，在其冷却之前垂直切割端部不平整及厚度不符合要求的部分(先用3m直尺进行检查) ，并冲净、干燥；第2天，涂刷粘层油，再铺新料。其他接缝做法执行普通沥青混合料路面施工要求。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]