[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1125582":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1125582,792,1,"单选题","路基施工程序是准备工作、( )、路基（土、石方）施工、质量检查与验收等。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","修建附属构筑物",true,{"key":16,"text":17,"correct":18},"B","路基施工测量",false,{"key":20,"text":21,"correct":18},"C","排除地面积水",{"key":23,"text":24,"correct":18},"D","清除地表腐殖土","2021\u002F2020版教材P10页 路基施工的基本流程是准备工作、修建附属构筑物、路基（土、石方）施工。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]