[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1125557":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1125557,792,1,"单选题","垃圾卫生填埋场填埋区工程的结构层次从上至下主要为( )",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","渗沥液收集导排系统→防渗系统→基础层",true,{"key":16,"text":17,"correct":18},"B","防渗系统→渗沥液收集导排系统→基础层",false,{"key":20,"text":21,"correct":18},"C","渗沥液收集导排系统→基础层→防渗系统",{"key":23,"text":24,"correct":18},"D","防渗系统→基础层→渗沥液收集导排系统","2021\u002F2020版教材P175 垃圾填埋场填埋区结构。垃圾卫生填埋场填埋区工程的结构层次从上至下主要为渗沥液收集导排系统、防渗系统和基础层。图2K316011渗滤液防渗系统、收集导排系统断面示意图.",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]