[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1125415":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1125415,792,1,"单选题","给水管道应进行( )试验，合格后方可通水投入运行。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","强度",false,{"key":16,"text":17,"correct":14},"B","满水",{"key":19,"text":20,"correct":14},"C","严密性",{"key":22,"text":23,"correct":24},"D","水压",true,"2021\u002F2020版教材P139 给水排水管道功能性试验分为压力管道的水压试验和无压管道的严密性试验。压力管道分为预试验和主试验阶段；试验合格的判定依据分为允许压力降值和允许渗水量值，按设计要求确定。设计无要求时，应根据工程实际情况，选用其中一项值或同时采用两项值作为试验合格的最终判定依据；水压试验合格的管道方可通水投入运行。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]