[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1125367":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1125367,792,1,"单选题","关于有盖水池的构筑物满水试验程序，排列正确的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","试验准备→水池注水→水池内水位观测→有关资料整理",true,{"key":16,"text":17,"correct":18},"B","水池注水→试验准备→水池内水位观测→有关资料整理",false,{"key":20,"text":21,"correct":18},"C","试验准备→水池注水→水池内水位观测→蒸发量测定→有关资料整理",{"key":23,"text":24,"correct":18},"D","水池注水→试验准备→水池内水位观测→蒸发量测定→有关资料整理","2021\u002F2020版教材P131 满水试验程序为：试验准备→水池注水→水池内水位观测→蒸发量测定→整理试验结论。蒸发量测定（1）池体有盖时可不测，蒸发量忽略不计。结合本试题是有盖水池，故蒸发量测定可以省去。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]