[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1125267":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1125267,792,1,"单选题","暗挖隧道外的超前加固技术不包括( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","降低地下水位法",false,{"key":16,"text":17,"correct":14},"B","地表锚杆（管）",{"key":19,"text":20,"correct":21},"C","小导管周边注浆",true,{"key":23,"text":24,"correct":14},"D","冻结法固结地层","2021\u002F2020版教材P109 暗挖隧道外常用的技术措施(1)地表铺杆或地表注浆加固。(2)冻结法固结地层。(3)降低地下水位法",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]