[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1125226":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1125226,792,1,"单选题","关于高压喷射注浆加固地基施工的基本工序，说法正确的是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","钻机就位→钻孔→喷射注浆",false,{"key":16,"text":17,"correct":14},"B","钻机就位→打入注浆管→喷射注浆→拔出注浆管",{"key":19,"text":20,"correct":14},"C","钻机就位→打入注浆管→钻孔→喷射注浆→拔出注浆管",{"key":22,"text":23,"correct":24},"D","钻机就位→钻孔→置入注浆管→喷射注浆→拔出注浆管",true,"2021\u002F2020版教材P93页 高压喷射注浆的全过程为：钻机就位、钻孔、置入注浆管、高压喷射注浆和拔出注浆管等基本工序。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]