[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1125191":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1125191,792,1,"单选题","箱涵顶进作业应在地下水位降至基底下（）以下进行，并宜避开雨期施工。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","0．5m",true,{"key":16,"text":17,"correct":18},"B","0．4m",false,{"key":20,"text":21,"correct":18},"C","0．3m",{"key":23,"text":24,"correct":18},"D","0．2m","P68-70 箱涵顶进作业面包括路基下地下水位已降至基底下500mm以下，并宜避开雨期施工，若在雨期施工，必须做好防洪及防雨排水工作。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]