[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1125161":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1125161,792,1,"单选题","当空气中盐分过大时，从穿完预应力筋至孔道灌浆完成的时间应控制在（）之内。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","7d",true,{"key":16,"text":17,"correct":18},"B","10d",false,{"key":20,"text":21,"correct":18},"C","15d",{"key":23,"text":24,"correct":18},"D","20d","P41-47 穿束后至孔道灌浆完成应控制在下列时间以内，否则应对预应力筋采取防锈措施： 空气湿度大于70%或盐分过大时，7d； 空气湿度40%~70%时，15d； 空气湿度小于40%时，20d。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]