[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1125100":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1125100,792,1,"单选题","关于沉人桩施工的说法，错误的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","宜先沉大桩，后沉小桩",false,{"key":16,"text":17,"correct":18},"B","桩身垂直度偏差不得超过1%",true,{"key":20,"text":21,"correct":14},"C","对于密集桩群，沉桩顺序宜由中间向两端或向四周施工",{"key":23,"text":24,"correct":14},"D","沉桩过程中应加强对邻近建筑物、地下管线等的观测、监护","2021\u002F2020版教材P57页 1)预制桩的接桩可采用焊接、法兰连接或机械连接，接桩材料工艺应符合规范要求。(2)沉桩时，桩帽或送桩帽与桩周围间隙应为5～10mm；桩锤、桩帽或送桩帽应和桩身在同一中心线上；桩身垂直度偏差不得超过0.5%。(3)沉桩顺序：对于密集桩群，自中间向两个方向或四周对称施打；根据基础的设计标高，宜先深后浅；根据桩的规格，宜先大后小，先长后短。(4)施工中若锤击有困难时，可在管内助沉。(5)桩终止锤击的控制应以控制桩端设计标高为主，贯入度为辅。(6)沉桩过程中应加强对邻近建筑物、地下管线等的观测、监护。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]