[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1125009":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1125009,792,1,"单选题","建设单位必须在竣工验收（ ）个工作日前将验收的时间、地点及验收组名单书面通知负责监督该工程的工程质量监督机构。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","15",false,{"key":16,"text":17,"correct":14},"B","10",{"key":19,"text":20,"correct":21},"C","7",true,{"key":23,"text":24,"correct":14},"D","5","建设单位必须在竣工验收7个工作日前将验收的时间、地点及验收组名单书面通知负责监督该工程的工程质量监督机构。故答案选C。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]