[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124994":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1124994,792,1,"单选题","对于资料反映不详、与实际不符或在资料中未反映管线真实情况的，应向规划部门、管线管理单位查询，必要时在（ ）在场情况下进行坑探查明现状。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","建设单位",false,{"key":16,"text":17,"correct":14},"B","监理单位",{"key":19,"text":20,"correct":21},"C","管线管理单位",true,{"key":23,"text":24,"correct":14},"D","建设主管部门","本题考查的是开挖过程中地下管线的安全保护措施。对于资料反映不详、与实际不符或在资料中未反映管线真实情况的，应向规划部门、管线管理单位查询，必要时在管理单位在场情况下进行坑探查明现状。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]