[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124992":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1124992,792,1,"单选题","箱涵顶进在穿越铁路路基时，在列车不允许限速情况下，可采用（ ）方法。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","轨束梁",false,{"key":16,"text":17,"correct":14},"B","纵横梁加固",{"key":19,"text":20,"correct":21},"C","施工便梁",true,{"key":23,"text":24,"correct":14},"D","钢板脱壳法","本题考查的是箱涵顶进施工安全措施。在土质条件差、地基承载力低、开挖面土壤含水量高，铁路列车不允许限速的情况下，可采用低高度施工便梁方法。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]