[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124976":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1124976,792,1,"单选题","人工施工水泥混凝土路面时，振动器的振动顺序为（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","平板式振捣器→插入式振捣器→振动梁（轻）→振动梁（重）→无缝钢管滚杆提浆赶浆",false,{"key":16,"text":17,"correct":14},"B","平板式振捣器→插入式振捣器→振动梁（重）→振动梁（轻）→无缝钢管滚杆提浆赶浆",{"key":19,"text":20,"correct":14},"C","插入式振捣器→平板式振捣器→振动梁（轻）→振动梁（重）→无缝钢管滚杆提浆赶浆",{"key":22,"text":23,"correct":24},"D","插入式振捣器→平板式振捣器→振动梁（重）→振动梁（轻）→无缝钢管滚杆提浆赶浆",true,"振动器的振动顺序为：插入式振捣器→平板式振捣器→振动梁（重）→振动梁（轻）→无缝钢管滚杆提浆赶浆。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]