[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124946":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1124946,792,1,"单选题","单位工程、分部工程和分项工程开工前，项目技术负责人对承担施工的负责人或分包方（ ）进行书面技术交底。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","生产人员",false,{"key":16,"text":17,"correct":14},"B","技术人员",{"key":19,"text":20,"correct":21},"C","全体人员",true,{"key":23,"text":24,"correct":14},"D","管理人员","本题考查的是施工准备阶段质量管理措施。单位工程、分部工程和分项工程开工前，项目技术负责人对承担施工的负责人或分包方全体人员进行书面技术交底。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]