[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124913":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1124913,792,1,"单选题","施工项目管理的核心是施工（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","安全管理",false,{"key":16,"text":17,"correct":14},"B","进度管理",{"key":19,"text":20,"correct":14},"C","质量管理",{"key":22,"text":23,"correct":24},"D","成本管理",true,"本题考查的是施工成本管理。施工项目管理的核心是施工成本管理。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]