[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124900":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1124900,792,1,"单选题","隧道采用（ ）时，必须事先编制爆破方案，报城市主管部门批准，并经公安部门同意后方可实施。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","降水施工",false,{"key":16,"text":17,"correct":14},"B","无水施工",{"key":19,"text":20,"correct":14},"C","喷锚暗挖施工",{"key":22,"text":23,"correct":24},"D","钻爆法施工",true,"《地下铁道工程施工及验收规范》(GB50299-1999)第7.1.1至第7.1.6条的规定：隧道采用钻爆法施工时，必须事先编制爆破方案，报城市主管部门批准，并经公安部门同意后方可实施。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]