[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124863":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1124863,792,1,"单选题","开工前复核基准点、基准线和高程时发现问题，应从（ ）获取准确结果。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","设计单位",false,{"key":16,"text":17,"correct":14},"B","勘察单位",{"key":19,"text":20,"correct":14},"C","监理单位",{"key":22,"text":23,"correct":24},"D","建设单位",true,"开工前应对基准点、基准线和高程进行内业、外业复核。复核过程中发现不符或与相邻工程矛盾时，应向建设单位提出，进行查询，并取得准确结果。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]