[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124859":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1124859,792,1,"单选题","竣工总图编绘完成，应经（ ）审核、会签。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","建设单位",false,{"key":16,"text":17,"correct":14},"B","监理单位",{"key":19,"text":20,"correct":21},"C","施工单位项目技术负责人",true,{"key":23,"text":24,"correct":14},"D","图纸设计单位","本题考查的是竣工图编绘与实测。竣工总图编绘完成后，应经施工单位项目技术负责人审核、会签。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]