[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124857":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1124857,792,1,"单选题","建筑物高程控制的水准点，可单独埋设在建筑物的平面控制网的标桩上，也可利用场地附近的水准点，其间距宜在（ ）左右。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","300m",false,{"key":16,"text":17,"correct":14},"B","100m",{"key":19,"text":20,"correct":14},"C","150m",{"key":22,"text":23,"correct":24},"D","200m",true,"本题考查的是场区控制测量。建（构）筑物高程控制的水准点，可单独埋设在建（构）筑物的平面控制网的标桩上，也可利用场地附近的水准点，其间距宜在200m左右。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]