[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124825":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1124825,792,1,"单选题","下列关于雨期基层施工的说法描述错误的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","应坚持拌多少、铺多少、压多少、完成多少",false,{"key":16,"text":17,"correct":14},"B","下雨来不及完成时，要尽快碾压，防止雨水渗透",{"key":19,"text":20,"correct":21},"C","分段开挖，切忌全面开挖或挖段过长",true,{"key":23,"text":24,"correct":14},"D","降雨时应停止施工，已摊铺的水泥混合料尽快碾压密实","分段开挖，切忌全面开挖或挖段过长属于雨期路基施工质量控制措施。@##",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]