[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124802":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1124802,792,1,"单选题","下列关于冬期沥青混合料面层施工的说法描述错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","城镇快速路、主干路的沥青混合料面层严禁冬期施工",false,{"key":16,"text":17,"correct":18},"B","次干路及透粘封层在施工温度低于5℃时应停止施工",true,{"key":20,"text":21,"correct":14},"C","快卸、快铺、快平，及时碾压、及时成型",{"key":23,"text":24,"correct":14},"D","适当提高拌合、出厂及施工时的温度","透粘封层严禁冬期施工，B选项错误。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]