[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124797":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1124797,792,1,"单选题","在沥青混合料面层运输与布料施工中，运料车应在摊铺机前（ ）处空挡等候，被摊铺机缓缓顶推前进并逐步卸料，避免撞击摊铺机。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","50cm",false,{"key":16,"text":17,"correct":18},"B","30cm",true,{"key":20,"text":21,"correct":14},"C","80cm",{"key":23,"text":24,"correct":14},"D","100cm","本题考查的是沥青混合料面层施工准备和摊铺作业。运料车应在摊铺机前100～300mm处空挡等候，被摊铺机缓缓顶推前进并逐步卸料，避免撞击摊铺机。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]