[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124783":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1124783,792,1,"单选题","新建地下管线施工时，应按“（ ）”的原则施工。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","先地下后地上",false,{"key":16,"text":17,"correct":14},"B","先地上后地下、先浅后深",{"key":19,"text":20,"correct":21},"C","先地下后地上、先深后浅",true,{"key":23,"text":24,"correct":14},"D","先深后浅","新建地下管线施工时，应按“先地下后地上、先深后浅”的原则施工。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]