[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124771":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1124771,792,1,"单选题","下列关于冬期路基施工的说法，错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","开挖冻土挖到设计标高立即碾压成型。",false,{"key":16,"text":17,"correct":18},"B","城市快速路、主干路冻土含量应小于10%",true,{"key":20,"text":21,"correct":14},"C","次干路以下冻土含量应小于15%",{"key":23,"text":24,"correct":14},"D","如当日达不到设计标高，下班前应将操作面刨松或覆盖","城市快速路、主干路不得含有冻土，B选项错误。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]