[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124758":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1124758,792,1,"单选题","下列关于HDPE膜焊接，表述错误的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","试验性焊接完成后，割下3块试块，测试撕裂强度和抗剪强度",false,{"key":16,"text":17,"correct":14},"B","当任何一试块没有通过撕裂和抗剪测试时，试验性焊接应全部重做",{"key":19,"text":20,"correct":21},"C","每一片膜要在铺设的当天进行焊接，即使底部接驳焊缝也不例外",true,{"key":23,"text":24,"correct":14},"D","所有焊缝做到从头到尾进行焊接和修补，唯一例外的是锚固沟的接缝","本题考查的是高密度聚乙烯膜防渗层施工技术。每一片HDPE膜要在铺设的当天进行焊接，如果采取适当的保护措施可防止雨水进入下面的地表，底部接驳焊缝，可以例外。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]