[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124709":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1124709,792,1,"单选题","换热站内所有系统均应进行严密性试验，试验压力是设计压力的（ ）倍，且不得低于（ ）MPa。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1.25；0.5",false,{"key":16,"text":17,"correct":18},"B","1.25；0.6",true,{"key":20,"text":21,"correct":14},"C","1.5；0.5",{"key":23,"text":24,"correct":14},"D","1.5；0.6","本题考查的是供热管道强度和严密性试验的规定。严密性试验：试验压力为1.25倍的设计压力，且不得低于0.6MPa。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]