[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124685":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1124685,792,1,"单选题","对接管口时，应检查管道平直度，在距接口中心200mm处测量，允许偏差（ ）mm。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","0～1",true,{"key":16,"text":17,"correct":18},"B","0～2",false,{"key":20,"text":21,"correct":18},"C","0～3",{"key":23,"text":24,"correct":18},"D","0～4","对接管口时，应检查管道平直度，在距接口中心200mm处测量，允许偏差为0～1mm，在所对接钢管的全长范围内，最大偏差值不应超过10mm。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]