[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124678":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1124678,792,1,"单选题","地下管道不开槽施工与开槽施工相比，其弱项是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","土方开挖和回填工作量",false,{"key":16,"text":17,"correct":14},"B","冬.雨期对施工的影响",{"key":19,"text":20,"correct":14},"C","对管道沿线的环境影响",{"key":22,"text":23,"correct":24},"D","管道轴线与标高的控制",true,"本题考查的是不开槽管道施工方法选择的依据与适用条件。教材没有明确的知识点，根据表 2K315012进行推断。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]