[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124668":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1124668,792,1,"单选题","小口径金属管道，当无地层变形控制要求且顶力满足施工要求时，可采用（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","挤密土层顶管法",true,{"key":16,"text":17,"correct":18},"B","盾构法",false,{"key":20,"text":21,"correct":18},"C","定向钻",{"key":23,"text":24,"correct":18},"D","夯管","本题考查的是不开槽管道施工方法与设备施工安全的有关规定。小口径金属管道，当无地层变形控制要求且顶力满足施工要求时，可采用一次顶进的挤密土层顶管法。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]