[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124644":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1124644,792,1,"单选题","沉井下沉监控量测做法错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","下沉时高程、轴线位移每班至少测量一次",false,{"key":16,"text":17,"correct":18},"B","终沉时，每班测一次，严格控制超沉",true,{"key":20,"text":21,"correct":14},"C","沉井封底前自沉速率应小于10mm\u002F8h",{"key":23,"text":24,"correct":14},"D","大型沉井应进行结构变形和裂缝观测","沉井下沉监控测量： 1）下沉时高程、轴线位移每班至少测量一次，每次下沉稳定后应进行高差和中心位移量的计算。 2）终沉时，每小时测一次，严格控制超沉，沉井封底前自沉速率应小于10mm\u002F8h。 3）如发生异常情况应加密量测。 4）大型沉井应进行结构变形和裂缝观测。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]