[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124589":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1124589,792,1,"单选题","CD工法基础上增设（ ），就形成了CRD工法。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","超前小导管",false,{"key":16,"text":17,"correct":18},"B","临时仰拱",true,{"key":20,"text":21,"correct":14},"C","钢拱架",{"key":23,"text":24,"correct":14},"D","管棚","本题考查的是浅埋暗挖法掘进方式。当CD工法不能满足要求时，可在CD工法基础上加设临时仰拱，即所谓的交叉中隔壁法（CRD工法）。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]