[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124527":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1124527,792,1,"单选题","确定悬臂浇筑段前段高程时，不需要考虑的因素是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","挂篮前端的水平变形值",true,{"key":16,"text":17,"correct":18},"B","预拱度设置",false,{"key":20,"text":21,"correct":18},"C","施工中已浇段的实际高程",{"key":23,"text":24,"correct":18},"D","温度影响","本题考查的是悬臂浇筑法。预应力混凝土连续梁，悬臂浇筑段前端底板和桥面高程的确定是连续梁施工的关键问题之一，确定悬臂浇筑段前段高程时应考虑：（1）挂篮前端的垂直变形值；（2）预拱度设置；（3）施工中已浇段的实际高程；（4）温度影响。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]