[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124526":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1124526,792,1,"单选题","湿接头混凝土的养护时间应不少于（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","7d",false,{"key":16,"text":17,"correct":18},"B","14d",true,{"key":20,"text":21,"correct":14},"C","28d",{"key":23,"text":24,"correct":14},"D","42d","本题考查的是装配式梁（板）的安装。湿接头混凝土的养护时间应不少于14d。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]