[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124522":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1124522,792,1,"单选题","采用平卧重叠法浇筑构件混凝土时，上层构件须待下层构件混凝土强度达到（ ）后方可浇筑。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","2.5MPa",false,{"key":16,"text":17,"correct":18},"B","5MPa",true,{"key":20,"text":21,"correct":14},"C","设计强度的50%",{"key":23,"text":24,"correct":14},"D","设计强度的75%","本题考查的是装配式梁（板）施工方案、制作与移存。采用平卧重叠法浇筑构件混凝土时，上层构件须待下层构件混凝土强度达到5MPa后方可浇筑。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]