[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124517":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1124517,792,1,"单选题","预应力混凝土梁、板的存放时间不宜超过（ ）个月，特殊情况下不应超过5个月。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","1",false,{"key":16,"text":17,"correct":14},"B","2",{"key":19,"text":20,"correct":21},"C","3",true,{"key":23,"text":24,"correct":14},"D","4","本题考查的是装配式梁（板）的预制、场内移运和存放。预应力混凝土梁、板的存放时间不宜超过3个月，特殊情况下不应超过5个月。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]