[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124481":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1124481,792,1,"单选题","预应力构件施工中属于先张法的工序是（ ）。（12年考点）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","放张",true,{"key":16,"text":17,"correct":18},"B","预留孔道",false,{"key":20,"text":21,"correct":18},"C","预应力管道清洗",{"key":23,"text":24,"correct":18},"D","孔道压浆","本题考查的是预应力张拉施工。先张法的施工工序包括：台座、预应力筋铺放与张拉、放张。",{"id":6,"name":27,"category":28,"favorite":29},"二建市政工程实务","建筑工程",0]